Calibration Procedures
Important Notice All following calibration procedures require connecting the UAV to QGroundControl (QGC) ground station and enabling developer mode.
2 min read · English documentationCalibration Procedures
Important Notice
All following calibration procedures require connecting the UAV to QGroundControl (QGC) ground station and enabling developer mode.
Sensor Calibration Steps:
- Connect the Type-C port below the control button to laptop using data cable
- Launch QGroundControl software




- Select the newly added port and click "Connect"

- Navigate to Sensors interface and sequentially calibrate:
- Compass
- Gyroscope
- Accelerometer
- Level Horizon

Calibration Notes:
- Compass Calibration
- Position UAV as shown and rotate when prompted
- Complete all surfaces until indicators turn green

- Gyroscope Calibration
- Keep UAV stationary on level surface

- Accelerometer Calibration
- Follow orientation prompts and maintain stillness

- Level Horizon Calibration
- Place UAV horizontally and wait for completion

Battery Voltage Calibration
- Measure battery voltage with multimeter
- Install battery and power on UAV
- Navigate to Power settings:
- Cell count: 4 (4S1P LiPo)
- Empty voltage: 3.60V
- Full voltage: 4.20V
- Input measured voltage and calculate


ESC Calibration
- Install battery along guide rails
- Initiate ESC calibration
- Press power button on UAV light cover when prompted
- Calibration will auto-complete


